Home > Projects > Oil & Gas
 
  Oil & Gas Projects
 
  DAS Offshore Engineering Pvt. Ltd has efficiently carried out operations in their core expertise of handling oil and natural gas projects.
 
  26 Well platform
  Client : Sarku Engineering Services  
  Nature of work : Revamping of 26 well platforms for ONGC. The activity included in revamp included:
  Structural modifications
  Piping modifications
  E and I related modifications
  Year : The project is still in progress
 
 
  MUT Pipeline
  Client : Hyundai Heavy Industries Co. Ltd.    
  Nature of work : Onshore fabrication, Offshore installation and Testing and pre-commissioning and commissioning assistance for topsides modifications.
  Platform : BHS
  Year : 2004 - 05
 
 
  MSP Modification
  Client : Hyundai Heavy Industries Co. Ltd.    
  Nature of work : : Project at BHS Oil and Gas Process Complex    
  Scope of work: : Onshore fabrication, Offshore installation, Testing, pre-commissioning and €commissioning assistance for the topsides modifications, Deck Extension, Revamping of Separators, E&I, etc.  
  Platform : SA, SLQ, BHS, WIS  
  Year : 2004 - 05  
 
 
  HV Well Platform
  Client : Hyundai Heavy Industries Co. Ltd.    
  Nature of work : Fabrication and installation, which includes replacement existing pipelines, Installation of topside platform modification and deck extension including launchers and receivers
  Platform : HF, WN-2, HX, HB, HE, SI-6, HD, NLP, NLW, NLM-1, NLM-2, NLM-3, NLM-4, NLM-6, NLM-8, NLM-9, NLM-10
  Year : 2003 - 04
 
 
  13 Clamp-on
  Client : Great Eastern Shipping Co. Limited  
  Nature of work : Installation of Clamp-on Structures
  Scope of work : Conductor Protector was fabricated and erected Offshore as a part of the 13 Clamp-on project.
  Platform : SF, SJ, SB, SQ, SS, SA, SI, IG, SK, SN, HC, HA, SR-8
  Year : 1999
 
 
  BCP A and B
  Client : Mazagon Dock Limited  
  Nature of work : Fabrication of piles and bridges for BCP-A and B platforms
  Year : 1998
       
 
 
  Helideck for NLM-5
  Client : Mazagon Dock Limited  
  Nature of work : Fabrication of Helideck for NLM-5 platform
  Scope of work : Upending of Helideck with structurally completed building module weighing 120 tonnes before commencement of fit out operations.
  Year : 1994
 
 
  NLM-9 Jacket
  Client : Mazagon Dock Limited    
  Nature of work : Fabrication, loading and sea-fasting of NLM-9 Jacket
  Scope of work : Fabrication of Jacket without boat landing / barge bumper having lift weight of - 1100 MT. * Fabrication of Piles 48" OD having lift weight of - 890 MT.
  Year : 1993
 